If that application went in in time, and if the ultimate constructing permit is issued within 3 decades, your system are going to be on NEM2. NEM3 is shorthand for that third Edition with the condition’s rooftop solar rules (identified as “Internet energy metering”). All of which led to PG&E’s https://www.diigo.com/item/pdf/ba775/ab53