The 25mm thick large metal tube is driven Together with the stop closed by a steel shoe. On achieving the essential driving resistance, a complete length cage is decreased in towards the tube and filled with high slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://castinsitupilesinbanglade52727.howeweb.com/33192836/detailed-notes-on-cast-in-situ-piles